Journal Article 다수 자원제약 하에서의 프로젝트 일정계획에 관한 연구
Cited - time in scopus Share share facebook twitter linkedin kakaostory
Authors
이정훈, 김판술, 문일경
Issue Date
2010-12
Citation
대한산업공학회지, v.36, no.4, pp.219-229
ISSN
1225-0988
Publisher
대한산업공학회
Language
Korean
Type
Journal Article
Abstract
The PERT/CPM are considered as the base procedures for the most successful project scheduling programs. Unfortunately, it is not easy to apply these procedures to real-life projects. This is due to the fact that PERT/CPM assume an infinite number of resources for each activity in project networks. Obviously, the completion time under no constraints is less than when constraints are imposed. One way of approaching this problem is to use heuristic solution techniques. In this paper, we present three heuristics; MRU (Maximum Resource Use)rule, STU (Shortest Time Use) rule, MRUP (Max Resource Use and Period) rule for allocating resources to activities of projects under multiple resource constraints. Comparisons of the project durations show that these heuristic rules are superior to AG3 rule that has been widely used in practice (Elsayed and Boucher, 1994).
KSP Keywords
Completion Time, Heuristic rules, Heuristic solution, Project scheduling, Resource use, Solution techniques, Successful project, resource constraints, time use