ETRI-Knowledge Sharing Plaform

KOREAN
논문 검색
Type SCI
Year ~ Keyword

Detail

Journal Article Economic Lot and Supply Scheduling Problem: A Time-Varying Lot Sizes Approach
Cited 4 time in scopus Share share facebook twitter linkedin kakaostory
Authors
Heechul Bae, Ilkyeong Moon, Wonyoung Yun
Issue Date
2014-04
Citation
International Journal of Production Research, v.52, no.8, pp.2422-2435
ISSN
0020-7543
Publisher
Taylor & Francis
Language
English
Type
Journal Article
DOI
https://dx.doi.org/10.1080/00207543.2013.866703
Abstract
We study the economic lot and supply scheduling problem (ELSSP) that arises in the distribution and manufacturing industries. The ELSSP involves the simultaneous scheduling of end-item production and inbound transportation of input materials over an infinite time horizon to minimise the average costs of inventory, production set-up and transportation. We present a new methodology based on a time-varying lot sizes approach for the ELSSP. We also provide computational experiments showing that the developed algorithm outperforms the existing heuristic for improved integrated scheduling. © 2013 Taylor & Francis.
KSP Keywords
Average cost, Economic lot and supply scheduling problem, Inbound transportation, Integrated scheduling, New methodology, Set up, Time horizon, Time-varying lot sizes approach, computational experiments, manufacturing industry, simultaneous scheduling